Alabama, Tennessee Rive Bridge Closure

Written by Chuck Baier
October 9, 2019

All lift span cables are to be replaced on the Southern Railroad Drawbridge, Mile 304.4, at Decatur, AL. Work will take place daily, from 7:00 a.m. until 5:00 p.m., from October 21-31, 2019. During this daily work, the drawbridge will be unable to open for navigation and will remain in the closed to navigation position. From 5:00 p.m. until 7:00 a.m., the drawbridge will return to normal operations.

Chuck Baier

[email protected]